Simulation Analysis for Bitumen Residuum Concrete Core Wall Rockfill Dam of White River Hydropower Station
Authors
Dongyu Ji
Corresponding Author
Dongyu Ji
Available Online September 2012.
- DOI
- 10.2991/emeit.2012.170How to use a DOI?
- Keywords
- Bitumen residuum concrete, Rockfill dam, Finite element, Simulation analysis
- Abstract
Through analyzing bitumen residuum concrete core wall rockfill dam structure’s mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out simulation analysis for bitumen residuum concrete core wall rockfill dam of White River hydropower station. Deducing distribution law of the dam’s stress and displacement in construction process and operational process. Analysis results show that, bitumen residuum concrete core wall rockfill dam of White River hydropower station construction is reasonable, it meets the requirements for design.
- Copyright
- © 2012, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Dongyu Ji PY - 2012/09 DA - 2012/09 TI - Simulation Analysis for Bitumen Residuum Concrete Core Wall Rockfill Dam of White River Hydropower Station BT - Proceedings of the 2nd International Conference on Electronic & Mechanical Engineering and Information Technology (EMEIT 2012) PB - Atlantis Press SP - 798 EP - 801 SN - 1951-6851 UR - https://doi.org/10.2991/emeit.2012.170 DO - 10.2991/emeit.2012.170 ID - Ji2012/09 ER -