Research on the Claim of Duration and Cost Based on the Model of Different Engineering Contracts
- DOI
- 10.2991/emehss-18.2018.97How to use a DOI?
- Keywords
- The Belt and Road, Engineering Claims, Construction.
- Abstract
In the "The Belt and Road" vision, Chinese engineering develops rapidly in foreign country. Engineering claims and their management have been the weak links in the field of engineering construction, mainly reflected in the legal system is not perfect, the claim consciousness is weak, the lack of experience in construction management, claims the lack of specialized personnel and etc. To solve this problem, first, this paper analyzed the claim of duration and cost in the determination of the circumstances. Then according to the comparative analysis of different forms of contract claims on project, in order to help Chinese contractor to select a reasonable contracts in foreign engineering, and enhance the sense of claims. After the occurrence of the claim, a reasonable claim can be made according to the agreement.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Meijing Wang PY - 2018/03 DA - 2018/03 TI - Research on the Claim of Duration and Cost Based on the Model of Different Engineering Contracts BT - Proceedings of the 2nd International Conference on Economics and Management, Education, Humanities and Social Sciences (EMEHSS 2018) PB - Atlantis Press SP - 482 EP - 485 SN - 2352-5398 UR - https://doi.org/10.2991/emehss-18.2018.97 DO - 10.2991/emehss-18.2018.97 ID - Wang2018/03 ER -