Research on Dynamic Compensation Achievement Path of Project Re-measurement based on Legal Fact Construction for State of Contract

Authors
Yilin Yin, Xuan Yang
Corresponding Author
Yilin Yin
Available Online November 2015.
DOI
10.2991/emeeit-15.2015.25How to use a DOI?
Keywords
Re-measurement State of Contract Dynamic Compensation Legal Fact
Abstract

Currently, the disputes on re-measurement and payment of the project cost between the employers and contractors in the projects istypically phenomenon. Such situation can be caused by the interference factors in the contract execution process, which can break the balance of the original state when the contract is signed but the employers cannot implement the effective compensation for the contract change state of the contractor. Perspective of the based on the presumption on the legal fact, the reasoning deduction method is used to convert the objective facts to be the directory application of the legal facts, which is further used to pay the bill of quantities and analyze the construction elements and construction path in the payment of bill of quantities.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International conference on Engineering Management, Engineering Education and Information Technology
Series
Advances in Computer Science Research
Publication Date
November 2015
ISBN
10.2991/emeeit-15.2015.25
ISSN
2352-538X
DOI
10.2991/emeeit-15.2015.25How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Yilin Yin
AU  - Xuan Yang
PY  - 2015/11
DA  - 2015/11
TI  - Research on Dynamic Compensation Achievement Path of Project Re-measurement based on Legal Fact Construction for State of Contract
BT  - Proceedings of the 2015 International conference on Engineering Management, Engineering Education and Information Technology
PB  - Atlantis Press
SP  - 118
EP  - 124
SN  - 2352-538X
UR  - https://doi.org/10.2991/emeeit-15.2015.25
DO  - 10.2991/emeeit-15.2015.25
ID  - Yin2015/11
ER  -