Application of PHM for Complex Electromechanical Equipments
Authors
Minghui Wu, Tianzhu Wen, Shang Meng, Haomin Dai
Corresponding Author
Minghui Wu
Available Online December 2013.
- DOI
- 10.2991/eeic-13.2013.23How to use a DOI?
- Keywords
- PHM, electromechanical equipments, state monitoring, information processing, decision making
- Abstract
PHM (Prognostic and Health Management) which is proposed by American army in JSF plan has gone through the fault diagnosis, fault prognostic and system integration three phases, and develops fast in both electronic and mechanical field. In this paper, the technical superiority of PHM is analyzed, and the framework of PHM for complex electromechanical equipment is built, which contains state monitoring, information processing and health management. Furthermore, the PHM system for complex electromechanical equipment is designed. At last, its application for DTG (Dynamically Tuned Gyroscope) shows that the system is feasible and usable.
- Copyright
- © 2013, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Minghui Wu AU - Tianzhu Wen AU - Shang Meng AU - Haomin Dai PY - 2013/12 DA - 2013/12 TI - Application of PHM for Complex Electromechanical Equipments BT - Proceedings of the 3rd International Conference on Electric and Electronics PB - Atlantis Press SP - 100 EP - 104 SN - 1951-6851 UR - https://doi.org/10.2991/eeic-13.2013.23 DO - 10.2991/eeic-13.2013.23 ID - Wu2013/12 ER -