Cost Control Analysis of Construction Stage of Assembly Building Based on Project B
Authors
Junxiao Yao, Yi Chen
Corresponding Author
Yi Chen
Available Online May 2019.
- DOI
- 10.2991/bems-19.2019.77How to use a DOI?
- Keywords
- integrated control; schedule variables; cost control measures suitable.
- Abstract
In this paper, through the analysis of the relationship between the cost progresses of the construction project in the Hongkou District of Shanghai, the integrated control process of the cost progress in the construction phase is compiled by using the earned value method and the work breakdown structure. This paper will introduce the cost and schedule variables based on the earned value management theory. By collecting and calculating the construction project usage, budget, actual consumption and budget gap, etc., we can verify the cost control measures suitable for the construction stage of the assembly building.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Junxiao Yao AU - Yi Chen PY - 2019/05 DA - 2019/05 TI - Cost Control Analysis of Construction Stage of Assembly Building Based on Project B BT - Proceedings of the 1st International Conference on Business, Economics, Management Science (BEMS 2019) PB - Atlantis Press SP - 441 EP - 445 SN - 2352-5428 UR - https://doi.org/10.2991/bems-19.2019.77 DO - 10.2991/bems-19.2019.77 ID - Yao2019/05 ER -