Proceedings of the International Conference "Actual Issues of Mechanical Engineering" 2017 (AIME 2017)

Basics of evaluation methods of HPP resource usage during operation in IPS

Authors
Alyona V. Sidorova, Anna Y. Arestova, Anastasia G. Rusina, Tamara A. Filippova
Corresponding Author
Alyona V. Sidorova
Available Online July 2017.
DOI
10.2991/aime-17.2017.131How to use a DOI?
Keywords
HPP; water energy resources; hydroelectric mode; structural model; utilization efficiency; technologic process; energy balance.
Abstract

In the electric-power systems, which include hydroelectric power plants (HPP), the important objective is the increasing of water resources utilization efficiency. Hydroelectric power plants have a great impact on the distribution of power at the regional level and especially in the wholesale electric power market in models of the type ®hydro resources - consumption of electric power¯. Some principles of calculation methodology for HPP are set forward in this paper. The authors call this type of model R-P-C (resources, production, capacity) of HPP. Taking into consideration the uncertainty of HPP consumption and information difficulties, tasks are traditionally divided into two parts (depending on the period of planning): the long-term and short-term modes. In this paper, the authors introduce the original methodology of evaluation of HPP's resources usage. The methodology consists of five units. The given methodology can serve as a basis for making a program for simulation of interconnected power system modes.

Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the International Conference "Actual Issues of Mechanical Engineering" 2017 (AIME 2017)
Series
Advances in Engineering Research
Publication Date
July 2017
ISBN
978-94-6252-406-4
ISSN
2352-5401
DOI
10.2991/aime-17.2017.131How to use a DOI?
Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Alyona V. Sidorova
AU  - Anna Y. Arestova
AU  - Anastasia G. Rusina
AU  - Tamara A. Filippova
PY  - 2017/07
DA  - 2017/07
TI  - Basics of evaluation methods of HPP resource usage during operation in IPS
BT  - Proceedings of the International Conference "Actual Issues of Mechanical Engineering" 2017 (AIME 2017)
PB  - Atlantis Press
SP  - 810
EP  - 815
SN  - 2352-5401
UR  - https://doi.org/10.2991/aime-17.2017.131
DO  - 10.2991/aime-17.2017.131
ID  - Sidorova2017/07
ER  -