Basics of evaluation methods of HPP resource usage during operation in IPS
- DOI
- 10.2991/aime-17.2017.131How to use a DOI?
- Keywords
- HPP; water energy resources; hydroelectric mode; structural model; utilization efficiency; technologic process; energy balance.
- Abstract
In the electric-power systems, which include hydroelectric power plants (HPP), the important objective is the increasing of water resources utilization efficiency. Hydroelectric power plants have a great impact on the distribution of power at the regional level and especially in the wholesale electric power market in models of the type ®hydro resources - consumption of electric power¯. Some principles of calculation methodology for HPP are set forward in this paper. The authors call this type of model R-P-C (resources, production, capacity) of HPP. Taking into consideration the uncertainty of HPP consumption and information difficulties, tasks are traditionally divided into two parts (depending on the period of planning): the long-term and short-term modes. In this paper, the authors introduce the original methodology of evaluation of HPP's resources usage. The methodology consists of five units. The given methodology can serve as a basis for making a program for simulation of interconnected power system modes.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Alyona V. Sidorova AU - Anna Y. Arestova AU - Anastasia G. Rusina AU - Tamara A. Filippova PY - 2017/07 DA - 2017/07 TI - Basics of evaluation methods of HPP resource usage during operation in IPS BT - Proceedings of the International Conference "Actual Issues of Mechanical Engineering" 2017 (AIME 2017) PB - Atlantis Press SP - 810 EP - 815 SN - 2352-5401 UR - https://doi.org/10.2991/aime-17.2017.131 DO - 10.2991/aime-17.2017.131 ID - Sidorova2017/07 ER -