Distribution Network Planning Evaluation Considering Risk Cost
Authors
Jianwei Xu, Haifeng Su, Zhirui Liang
Corresponding Author
Jianwei Xu
Available Online November 2016.
- DOI
- 10.2991/aiea-16.2016.32How to use a DOI?
- Keywords
- Distribution Network, Planning, Life Cycle Cost, Risk.
- Abstract
There are many uncertain factors that affect the planning of power network, and these uncertain risk factors appear in all stages of the life cycle. The uncertainty of load and electricity price directly affects the whole life cycle cost of the plan. In the whole life cycle cost calculation of power system planning, the uncertainty of load and electricity price is included, so that the whole life cycle cost evaluation of power system planning is more reasonable.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jianwei Xu AU - Haifeng Su AU - Zhirui Liang PY - 2016/11 DA - 2016/11 TI - Distribution Network Planning Evaluation Considering Risk Cost BT - Proceedings of the 2016 International Conference on Artificial Intelligence and Engineering Applications PB - Atlantis Press SP - 172 EP - 175 SN - 2352-538X UR - https://doi.org/10.2991/aiea-16.2016.32 DO - 10.2991/aiea-16.2016.32 ID - Xu2016/11 ER -