Proceedings of the 2019 International Conference on Advanced Education, Management and Humanities (AEMH 2019)

Research on Construction Cost Based on Dynamic Management Engineering Cost

Authors
Kunfa Lee, Ying Lu, Jingchun Chen
Corresponding Author
Jingchun Chen
Available Online October 2019.
DOI
10.2991/aemh-19.2019.23How to use a DOI?
Keywords
Project cost, Dynamic management, Engineering project
Abstract

With the construction cost management of construction has become the focus of attention, in order to strengthen the construction cost to optimize the dynamic cost and cost, and to rationally control the continuous development of the basic cost and cost, the dynamic management and control of construction project cost has become an important issue in reducing construction cost management. The more attention you attach. For the project investment cost, improve the project cost efficiency, the construction project cost management runs through the whole process of the project, how to control the project cost and the high efficiency management, for each construction company must face the problem. This paper discusses the development of high efficiency of the company's engineering cost management.

Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2019 International Conference on Advanced Education, Management and Humanities (AEMH 2019)
Series
Advances in Social Science, Education and Humanities Research
Publication Date
October 2019
ISBN
978-94-6252-809-3
ISSN
2352-5398
DOI
10.2991/aemh-19.2019.23How to use a DOI?
Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Kunfa Lee
AU  - Ying Lu
AU  - Jingchun Chen
PY  - 2019/10
DA  - 2019/10
TI  - Research on Construction Cost Based on Dynamic Management Engineering Cost
BT  - Proceedings of the 2019 International Conference on Advanced Education, Management and Humanities (AEMH 2019)
PB  - Atlantis Press
SP  - 113
EP  - 117
SN  - 2352-5398
UR  - https://doi.org/10.2991/aemh-19.2019.23
DO  - 10.2991/aemh-19.2019.23
ID  - Lee2019/10
ER  -