Research on the High Ground Temperature Risk during Long Tunnel Construction
- DOI
- 10.2991/aeece-15.2015.116How to use a DOI?
- Keywords
- Deep buried long tunnel; high ground temperature; risk; heat source
- Abstract
The high ground temperature is a prominent problem in the construction of deep buried long tunnels. Based on the analysis of high ground temperature in existing tunnels, the influence of high ground temperature on tunnel construction was divided into three situations, namely the harm to human body, effects on labor productivity and accident rate increasing. Then the high temperature heat sources during the tunnel construction were researched. The high ground temperature evolution law of famous tunnel in the history was studied by using comparative analysis method, also the reason of ground temperature anomalies and the heat transfer type of rock mass was obtained. Based on the geothermal gradient formula and the reliability theory, the risk probability model of high ground temperature was obtained in the deep buried long tunnel construction. The results show that the method can predict the high ground temperature in deep buried tunnel accurately.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Peiyu Yu PY - 2015/09 DA - 2015/09 TI - Research on the High Ground Temperature Risk during Long Tunnel Construction BT - Proceedings of the International Conference on Advances in Energy, Environment and Chemical Engineering PB - Atlantis Press SP - 584 EP - 587 SN - 2352-5401 UR - https://doi.org/10.2991/aeece-15.2015.116 DO - 10.2991/aeece-15.2015.116 ID - Yu2015/09 ER -