International Journal of Computational Intelligence Systems

Volume 6, Issue 2, March 2013, Pages 244 - 260

Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals

Authors
Peng Guo, Wenming Cheng, Zeqiang Zhang, Min Zhang, Jian Liang
Corresponding Author
Peng Guo
Received 8 August 2011, Accepted 25 August 2012, Available Online 1 March 2013.
DOI
10.1080/18756891.2013.768444How to use a DOI?
Keywords
Railway container terminal, Gantry crane scheduling, Interference constraint, Artificial bee colony algorithm
Abstract

Railway container terminals, where gantry cranes are responsible for loading and unloading containers between freight trains and yards, are important hubs of hinterland logistics transportation. Terminal managers confront the challenge in improving the efficiency of their service. As the most expensive equipment in a terminal, the operational performance of gantry cranes is a crucial factor. In this paper, the gantry crane scheduling problem of railway container terminals is investigated. A mixed integer programming model which considers the effect of dwelling position dependent processing times is formulated. In addition, the safety distances, the travel times and the non-crossing requirement of cranes are incorporated in the mathematical model. A novel discrete artificial bee colony algorithm is presented to solve the intractable scheduling problem. Computational experiments are conducted to evaluate the proposed algorithm on some randomly constructed instances based on typical terminal operational data. Experimental results show that the proposed approach can obtain near optimal solutions for the investigated problem in a reasonable computational time.

Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Journal
International Journal of Computational Intelligence Systems
Volume-Issue
6 - 2
Pages
244 - 260
Publication Date
2013/03/01
ISSN (Online)
1875-6883
ISSN (Print)
1875-6891
DOI
10.1080/18756891.2013.768444How to use a DOI?
Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - JOUR
AU  - Peng Guo
AU  - Wenming Cheng
AU  - Zeqiang Zhang
AU  - Min Zhang
AU  - Jian Liang
PY  - 2013
DA  - 2013/03/01
TI  - Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals
JO  - International Journal of Computational Intelligence Systems
SP  - 244
EP  - 260
VL  - 6
IS  - 2
SN  - 1875-6883
UR  - https://doi.org/10.1080/18756891.2013.768444
DO  - 10.1080/18756891.2013.768444
ID  - Guo2013
ER  -